PROVEn across bhutan

Built for
Purpose.
Built to last.

From a family home in Phuentsholing to a multi-building industrial complex in Samtse, our work demonstrates faster delivery, strong and safe structures, and respect for Bhutanese architecture.

8
Major Projects
7
Completed
6
Dzongkhags

Trusted By

Royal University of Bhutan

Phuentsholing Thromde

BLDCL

BHSL

MoESD

Selected work

Project Portfolio

Everything you need to know about Bhotan PEB Ltd. — our story, purpose, and the people behind our work.

Modular Duplex Home
01
REPRESENTATIVE PEB IMAGERY
RESIDENTIAL
COMPLETED

Modular Duplex Home

PHUENTSHOLING

A modern two-storey modular home built with light gauge steel framing and finished with traditional Bhutanese architectural details. Completed in just six months, it demonstrates how PEB technology can deliver a durable, energy-efficient family home at a competitive cost.

PROJECT AREA
1,500 sq ft
PROJECT COST
Nu. 3.8 million
COMPLETION TIME
6 months
96-Bed Girls' Hostels
02
REPRESENTATIVE PEB IMAGERY
INSTITUTIONAL
COMPLETED

96-Bed Girls' Hostels (2 Units)

GEDU COLLEGE OF BUSINESS STUDIES

Two multi-storey hostel blocks providing safe, comfortable accommodation for 96 students. Built with LGSF structures and PUF insulated panels, the hostels provide excellent insulation and earthquake resistance and were completed within nine months.

CLIENT
Royal University of Bhutan (RUB)
PROJECT AREA
35,000 sq ft
PROJECT COST
Nu. 77 million
COMPLETION TIME
9 months
96-Bed Girls' Hostels
03
REPRESENTATIVE PEB IMAGERY
Food Processing
COMPLETED

Reprocessing and Repacking Facility
(2 Units)

Serbithang, Thimphu

Two purpose-built units for food reprocessing and repacking, constructed with hygienic, washable PUF panel surfaces suited to food handling. Delivered in four months, the facility became operational far sooner than a conventional build would allow

CLIENT
Bhutan Livestock Development Corporation Limited (BLDCL)
PROJECT AREA
2,027 sq ft
PROJECT COST
Nu. 5.1 million
COMPLETION TIME
4 months
96-Bed Girls' Hostels
04
REPRESENTATIVE PEB IMAGERY
Public Infrastructure
COMPLETED

Pedestrian Terminal

Phuentsholing

A modern public pedestrian terminal combining a steel structure with traditional Bhutanese design elements. Fast PEB construction kept disruption in the busy border town to a minimum while delivering a spacious, open-plan public facility.

CLIENT
Phuentsholing Thromde
PROJECT AREA
11,585 sq ft
PROJECT COST
Nu. 49.40 million
COMPLETION TIME
6 months
96-Bed Girls' Hostels
05
REPRESENTATIVE PEB IMAGERY
Cold Storage
COMPLETED

Cold Storage Facility and Office

Samrong, Samdrup Jongkhar

A combined cold storage and office facility equipped with blast freezers and cold rooms. PUF insulated panels provide the thermal performance needed to maintain consistent low temperatures while reducing operational energy costs.

CLIENT
Bhutan Livestock Development Corporation Limited (BLDCL)
PROJECT AREA
2,562 sq ft
PROJECT COST
Nu. 14.80 million
COMPLETION TIME
6 months
96-Bed Girls' Hostels
06
REPRESENTATIVE PEB IMAGERY
Industrial
COMPLETED

Transformer Repair Center with EOT Cranes

Jigmeling, Gelephu

A large-span industrial facility fitted with electric overhead travelling cranes for heavy transformer repair work. Pre-engineered steel enables wide, column-free interiors, and the complete facility was delivered in six months.

CLIENT
BHSL
PROJECT AREA
21,554 sq ft
PROJECT COST
Nu. 60.71 million
COMPLETION TIME
6 months
96-Bed Girls' Hostels
07
REPRESENTATIVE PEB IMAGERY
Industrial Complex
COMPLETED

Industrial Facility Complex

Norbugang Industrial Park, Samtse

A complete nine-building complex delivered under a single contract, including PEB construction and all civil works. It comprises an admin block, CEO and plant offices, quality assurance laboratory, workshop, general store, cafeteria, security office, and plant facilities.

CLIENT
ACE Himalaya Ferro Alloys Pvt Ltd
PROJECT AREA
15,952 sq ft
View Breakdown
PROJECT COST
Nu. 55 million
COMPLETION TIME
8 months
96-Bed Girls' Hostels
08
REPRESENTATIVE PEB IMAGERY
Education
ONGOING

Tangmachu Central School and Primary School

Lhuentse

Our largest project to date: the design and construction of new school buildings and renovation of existing structures at Tangmachu Central School and Primary School. PEB technology and civil works will provide safer, more comfortable and longer-lasting learning spaces.

CLIENT
Ministry of Education and Skills Development (MoESD)
PROJECT AREA
189.61 sq ft
COMPLETION TIME
24 months · Started July 2025

have a project in mind?

Let's build it faster,
stronger and snarter